Guide · gas dehydration
Molecular sieve dryer breakthrough: how to detect it with trace moisture
Molecular sieve dryers take natural gas down to trace water levels before LNG liquefaction, cryogenic NGL recovery and nitrogen rejection. A bed can only hold so much water. When it is nearly full, water starts to appear at the outlet: this is breakthrough. If it reaches the cold box, it freezes and can plug the main heat exchanger. A trace moisture analyzer at the dryer outlet shows breakthrough as it starts, and confirms that a regenerated bed is back in specification.
At a glance
| Typical outlet specification | Often around 0.1 ppmv water (about −90 °C frost point at atmospheric pressure) or drier; the exact limit is set by the process licensor |
|---|---|
| What breakthrough looks like | Outlet moisture stays flat at trace level, then rises, slowly at first and then quickly |
| Where to measure | Outlet of each bed or the common dryer outlet; optionally a mid-bed sample point for early warning |
| Analyzer | In-line trace moisture analyzer with a range down to −110 °C frost point; explosion-proof version where the analyzer sits in the hazardous area |
| Sample conditioning | Reduce pressure to the analyzer's limit, short electropolished stainless steel line, continuous bypass flow |
How a molecular sieve bed fills up
- The gas flows through the bed, usually downwards. Water is adsorbed in a narrow band of the bed, the mass transfer zone.
- Above the zone the sieve is saturated with water; below it the sieve is still dry. With every hour of operation the zone moves further down the bed.
- While the zone is inside the bed, the outlet gas stays at trace moisture. When the front of the zone reaches the bottom of the bed, the outlet moisture starts to rise. This is breakthrough.
- Units usually run two or more beds: one or more adsorb while another is regenerated with hot gas and then cooled.
Why breakthrough comes earlier over time
- Each regeneration cycle exposes the sieve to hot, wet gas. Over the years this slowly reduces the amount of water the sieve can hold.
- Heavy hydrocarbons, amine or glycol carry-over and liquids from upstream reduce capacity further and can damage the sieve.
- Incomplete regeneration (too short, too cool, or not enough regeneration gas) leaves water in the bed, so the next adsorption step starts with less capacity.
- Higher feed temperature or higher water content in the feed gas loads the bed faster.
A bed that broke through after a certain time when the sieve was new will break through earlier as it ages. Plotting the time to breakthrough for each bed over months shows how fast the sieve is ageing and helps plan the change-out.
Where to place the analyzer
- Outlet of each bed. Shows which bed is breaking through and lets you check each bed after regeneration. Several beds can share one analyzer through a sample switching system, but the switching interval must allow for dry-down time after each change.
- Common dryer outlet. One analyzer protects the downstream unit. It cannot tell which bed is the cause.
- Mid-bed sample point (optional). A sample taken partway down the bed shows the water front arriving before it reaches the outlet. This gives early warning and helps judge how much capacity is left.
- After the dust filter, before the cold box. Confirms the gas that actually enters the cryogenic section.
See these points on the LNG pretreatment and natural gas processing measurement maps.
Time-based or moisture-based switching
Most units switch beds on a fixed timer, with a safety margin chosen when the sieve was new. With a reliable outlet or mid-bed moisture measurement, the operator can see how much margin is actually left. Some plants then extend the adsorption time, which means fewer regeneration cycles, less regeneration gas and fuel, and slower sieve ageing. Any change to the cycle is a process decision for the plant and the licensor; the analyzer provides the data.
Getting a reliable trace moisture reading
- Pressure. YORK dew point instruments accept sample pressure up to 4 barg. Reduce the pressure at the sample point and measure close to atmospheric pressure, then convert the result to line pressure with the dew point calculator or the dew point to ppm guide.
- Sample line. Use short, electropolished stainless steel tubing and as few fittings as possible. Plastic tubing and leaking fittings let moisture in and make the reading wetter than the process.
- Flow. Keep the sample flowing continuously, with a bypass if needed, so that the line does not have to dry down again after each stop.
- Dry-down. After installation, maintenance or a large upset, the line and sensor need time to dry down to trace levels; allow for this before trusting the reading.
- Liquids and particles. Install a filter for sieve dust and protect the sensor from liquid carry-over.
- Hazardous area. Where the analyzer sits in the classified area, use the explosion-proof version. Certificate details are sent with quotations.
Which YORK instrument
| Task | Instrument | Notes |
|---|---|---|
| Dryer outlet, analyzer in a safe area or analyzer shelter | DPT830 | In-line, down to −110 °C frost point, with outputs and alarm relays |
| Dryer outlet, analyzer in the hazardous area | DPT990-EX | Explosion-proof in-line dew point analyzer |
| Commissioning, checking a regenerated bed, troubleshooting | DPT-600 Plus | Portable, down to −110 °C frost point |
| Several beds, one analyzer | Sample switching panel with DPT830 | Built by YORK in Chengdu as a panel or inside an analyzer shelter |
Frequently asked questions
What is molecular sieve breakthrough?
It is the point at which a molecular sieve bed is nearly saturated and water starts to appear in the outlet gas. Outlet moisture first stays flat at trace level, then rises, slowly at first and then quickly.
What moisture level should a molecular sieve dryer achieve before LNG liquefaction?
Often around 0.1 ppmv water, about −90 °C frost point at atmospheric pressure, or drier. The exact limit is set by the process licensor for the specific plant.
Should the analyzer be at each bed outlet or at the common outlet?
An analyzer at each bed outlet, or one analyzer switched between beds, shows which bed is breaking through and confirms each bed after regeneration. A single analyzer at the common outlet protects the downstream unit but cannot identify the bed. Many plants use both.
Can a moisture analyzer extend molecular sieve life?
It can provide the data to do so. With a reliable outlet or mid-bed reading, some plants lengthen the adsorption step, which reduces the number of regeneration cycles. The cycle itself is set by the plant and the licensor.
Measuring at a molecular sieve dryer?
Send the gas, line pressure, outlet specification, area classification and number of beds, and our Dubai team will propose the analyzer and sample system.